These pictures show the frame from Art Morrison. It is a 2 x 3 x 0.120 wall tubing. It has the front lower strut control arm brackets welded on. It also has the 4 - link brackets installed. This will give more combinations of instant centers than even I can calculate! The front frame members are 26 inches outside to outside while the rear clip is only 21 inches wide. Brackets for the Aldan Eagle coil over shocks and the panhard bar are also welded in. The 2 x 6 is holding up one of the strut upper tube mounts sort of in the position it will be welded, when I get the frame installed onto the body. I am going to keep the front track width the same as the Alpine/Tiger. The front rack and pinion cross member is also welded in: I will be using a Pinto manual rack from Flaming River. Because this puppy has a stretched frame, 90 inch wheelbase, I expect to get near perfect ackerman angles. But, for a straight ahead car, who cares! All rotating joints are Heim ball sockets made from 4340 steel.



Looks like there is plenty of space for the motor, tranny, dual turbos, etc....

Copyright (C) 1998 - 2004, all dates inclusive, L.E. Mayfield - All Rights Reserved